RED by Waterline Yachts |
|||
|
HansenCrafts Home-Sailing RED Gallery Articles Cruising Notes Travels FAQ |
|
|
Construction
The deck is almost complete in this photo. Note that the cutout for the mast hasn't been inserted between the forward-looking windows... Because the deck is covered with grinding dust, it's very slippery. Note the safety cleats welded to the deck to prevent falls. It's a long way down to the concrete floor, about 12 feet. |
|
© 2005-2010 Beth and Kevin Hansen, all rights reserved |